Kelly Avenue Storm Drain Project

Project Description: This program includes the design and preparation of environmental studies and bid documents for prioritized improvements identified in the Storm Drain Master Plan and Storm Drain Master Plan CIP.

Project Status: Ongoing

Latest Update: 8/19/18 - projects scheduled for FY 18‐19 include the construction of storm drain facilities at Highway 1 to alleviate storm water flooding along Kelly Avenue; design and permitting of retention wall adjacent to Pullman Court and Champs Elysee along Roosevelt Ditch. Future year projects include assessment and potential improvements at Wavecrest. FY 18-19 funding: $292,495.

Contact:  Brian Lee, CIP Engineer
blee@hmbcity.com