Highway 1 Safety and Operational Improvements – North

Project Description: Operational and safety improvements to Highway 1 between North Main Street and Spindrift Way. Improvements include Class I multi-use path from Main to Spindrift and signalization of Highway 1 and Terrace Avenue

Project Status:  35% design completed and reviewed by Caltrans.  Survey, geotechnical investigation and design of retaining walls are underway.

Funding Source(s): Measure A grant from San Mateo County Transportation Authority (SMCTA) and Pacific Ridge Subdivision Traffic Impact Fees.

Latest Update:   02/13/2020 - 35% design has been completed, reviewed by Caltrans and implemented.  Survey, geotechnical investigation and design of retaining walls are underway.  Regulatory permit requests will be initiated following the completion of the 65% design.

Contact: Ray Razavi, Transportation Engineer, E-mail

More Information:

2017-08-22_HWY 1_North_Full GeD with Aerial