Project Description: The project will extend the current Class I path (North end of Naomi Patridge Trail) from Roosevelt Blvd north to the City limits at Mirada Road (approximately 0.26 miles).

Project Status: Consultant has initiated the design and environmental clearance.

Funding Source: Measure A grant from San Mateo County Transportation Authority (SMCTA) and City General Fund

Latest Update: 08/7/2019 - The City has selected and entered into an agreement with ALTA Planning+ Design Inc. to prepare the design/construction package and the environmental documents. Completion of the 30% design is expected by November 2019.

Contact: Ray Razavi, Transportation Engineer, E-mail